Submittal software for glazing and door hardware contractors should read Division 08, list every submittal each section demands with its paragraph reference, and track each package through the GC and architect until the stamp comes back. Submittal does that. Upload the project manual, get one register row per required item (shop drawings, glass samples, performance test reports, hardware schedules, mockup records, warranties), and keep long lead openings from waiting on a missing approval. Plans start at 24 USD a month per active project billed yearly, and the GC and design team you invite are unlimited.

Glazing project manager reviewing a Division 08 submittal register on a tablet at a curtain wall mockup
1.0

What an openings submittal register has to cover

Openings are a long lead, high rework trade. Curtain wall extrusions and insulated glass units are fabricated to approved shop drawings, hardware is ordered from an approved schedule, and a color or finish comment can reset a fabrication slot. A generic log tells you a package exists. A spec built register tells you which of the items in each section you have not yet sent.

Division 08 sectionTypical submittals the spec asks forWhy they hold up the job
08 44 13 glazed aluminum curtain wallsShop drawings with anchors and thermal movement details, structural and thermal calculations, glass and finish samples, performance test reports, mockup planFabrication starts only from the approved drawings, and the mockup often must pass before production
08 41 13 aluminum framed entrances and storefrontsProduct data, shop drawings, finish samples, door and frame elevationsEntrances are coordinated with hardware, access control and electrical rough in
08 80 00 glazingGlass samples, performance data (U-factor, SHGC, visible light), sealant compatibility, glazing detailsGlass is ordered on a long lead and changes are costly after cutting
08 11 13 hollow metal doors and framesDoor and frame schedule, shop drawings, fire rating labels, finish dataFrame location is needed before the walls are framed
08 71 00 door hardwareHardware schedule with sets, keying schedule, product data, templatesThe hardware schedule drives door prep, access control and keying meetings
08 71 13 and 28 13 00 automatic operators and access controlOperator data, wiring diagrams, coordination with securityCrosses electrical and low voltage trades that submit separately
Section 01 33 00 and 01 78 00Administrative submittals, installer qualifications, warranties and O&M dataWarranties and closeout documents gate final payment

Try it on your own Division 08 sections before you buy. The homepage tool builds the rows for a spec section you upload, so you can see whether it finds the items your project manager would find.

2.0

The submittal problems that delay curtain wall, storefront and hardware

Most opening delays are visible in the submittal log weeks before the glass is cut.

  • Hardware sets and keying that are submitted as a long schedule, returned with comments on a few doors, and then held as a whole
  • Glass performance data that must match the specified U-factor and solar heat gain values, with the data sheet showing a slightly different coating
  • Mockups and performance testing that the spec requires before fabrication, and that nobody put on the schedule
  • Finish and color decisions that stay open until the owner signs off, while extrusions wait
  • Coordination items that belong to other trades, such as access control, electrical rough in and wall framing at frames
  • Closeout items such as warranties, hardware keying documents and maintenance instructions, which pile up at substantial completion

A register built from the spec makes each of these a row with a due date and an owner on day one. Our guide to construction submittal examples shows how a package is numbered and what comes back with it. When a package returns marked up, what revise and resubmit means explains how to turn comments into a clean second round, and shop drawings versus product data shows which type each Division 08 item is.

3.0

From the Division 08 spec to a tracked register

  1. 1Upload the project manual. Submittal finds the MasterFormat sections, scanned PDFs included, and you select Division 08 plus the administrative sections that touch openings.
  2. 2Review the register. Each required item is one row with its paragraph. Action, informational and closeout items are separated, so you see test reports and warranty forms next to the shop drawings.
  3. 3Set dates from the schedule. Give each row a due date calculated back from the fabrication lead time and the install window.
  4. 4Send and track packages. Each package goes to the GC and the design team in order, with one of five standard stamps. You see whose turn it is and when it is overdue.
  5. 5Close out. Warranties, keying documents and maintenance items stay on the list from day one, so nothing is left for the last week.

The longer walkthrough is on the construction specification software page.

4.0

Glazing, storefront and door hardware teams

  • Project managers and estimators at glazing and curtain wall subcontractors who run several jobs for different GCs
  • Door, frame and hardware suppliers and installers who keep a hardware schedule and keying submittal across projects
  • Project engineers who keep the submittal log and chase stamps, usually in Excel today
  • Owners of small and mid size openings firms who want one register per job without paying a seat for every office user

Openings are a subcontract trade on most commercial jobs, so you usually submit into the GC's system and also need your own list. Submittal gives you that list per project, and the GC you invite joins at no cost. Openings sit next to other envelope and finish trades, so if your firm also covers sheet metal or roof edge work, see the submittal software for roofing contractors page, and for the broader sub view the submittal software for subcontractors page. If you are weighing platforms, the best submittal software for subcontractors comparison shows what each costs.

5.0

What glazing submittal software costs per project

Per user tools charge for every estimator, PM and coordinator who opens a package. Submittal charges for active projects, and the GC, architect and engineers you invite are unlimited.

Your workloadSubmittal planYearly cost billed yearly
1 active projectStarter288 USD
Up to 5 active projectsTeam888 USD
Up to 25 active projectsBusiness2,988 USD

Monthly billing is 49, 149 and 499 USD. Compare that with the hours spent building a Division 08 register by hand for each award, then with one rejected hardware schedule that delays door prep by two weeks. For vendor by vendor numbers see the submittal software pricing comparison, and for our own limits see the submittal management software page.

6.0

Check the data sheet against the right reference

Opening specs cite outside standards, and the submittal has to show the product meets them. Curtain wall and storefront performance is commonly tied to AAMA and ASTM test methods named in the spec, and glazing energy values are published in the NFRC rated product directory at nfrc.org. Door hardware schedules follow the Builders Hardware Manufacturers Association grades at buildershardware.com. Submittal does not replace that review. It makes sure the item is on the list, has an owner and a date, and is not forgotten until the fabricator asks for it.

7.0

Frequently asked questions

What is the best submittal software for glazing contractors?

The best fit reads the Division 08 sections, lists every required submittal with its paragraph, and tracks each package through the GC and architect. Submittal does this and is priced per active project, from 24 USD a month billed yearly for one project, with the GC and reviewers free.

What submittals does a glazing contractor usually have to provide?

Typically shop drawings with anchor and movement details, structural and thermal calculations, glass and finish samples, performance test reports, mockup records, installer qualifications and warranties. Your spec lists them paragraph by paragraph, and the register keeps them together.

Can I build a door hardware submittal log from the specifications?

Yes. Upload the project manual and Submittal creates one register row per item each section requires, linked to its paragraph, including the hardware schedule and keying submittals. You review the rows, set due dates and group them into numbered packages.

Do glazing subcontractors pay for the GC's submittal software?

It depends on the GC's platform. Many charge nothing to submit into it, but you still need your own list across jobs and GCs. A per project tool keeps that register in one place without paying a seat for every office user.

How much does submittal software cost for a glazing company?

Submittal charges per active project, not per user. One project is 288 USD a year billed yearly, five projects 888 USD, and 25 projects 2,988 USD. The GC and reviewers you invite are unlimited.