Submittal software for electrical contractors, with switchgear, lighting and low voltage submittals built from your spec
Submittal software for electrical contractors should read your Division 26, 27 and 28 sections, list every item they require with its paragraph reference, and track each package through the GC and engineer until the stamp comes back. Submittal does that. Upload the project manual, get one register row per required item (product data, shop drawings, coordination studies, test reports, O&M manuals), and run packages through review on a plan that costs 24 USD a month per active project billed yearly. The GC's own platform does not have to change.

What submittal software fits an electrical contractor
An electrical sub needs three things from a submittal tool. It has to find everything the electrical sections ask for, including the studies and closeout items nobody reads until the last month. It has to work across GCs who run different systems. And it has to be priced so that a PM who runs six jobs a year does not pay for six seats times four people.
| What an electrical sub needs | How Submittal handles it |
|---|---|
| Every item from Division 26, 27 and 28 listed from Part 1 | One register row per item, each linked to its section and paragraph, for example 26 24 16, 1.4.A |
| Long lead gear tracked by date | Lead-time tracking back-calculates the submit date from the required on site date, on Team and higher |
| Packages that match the GC's numbering | Numbering such as 262416-002-R1, custom formats on Team and higher |
| Review through GC, electrical engineer and architect | Review route in order with five standard stamps and ball in court |
| Working for GCs on Procore, Autodesk Build or Fieldwire | Run your own register, export Excel, CSV or PDF in the format each GC wants |
| Closeout and retainage | Closeout items split out of Part 1 from day one, one closeout binder PDF on Business and Enterprise |
| Cost | Per active project, not per user. Starter 24 USD a month yearly, Team 74 for five projects |
Try it on one section before you buy. The homepage tool builds the rows for a spec section you upload, so you can see whether it catches what your PM would catch.
Where electrical packages go wrong
Electrical submittals are heavy on gear with long lead times and on studies that depend on other trades, and the same few problems cause most resubmittals.
- Switchgear and panelboards under 26 24 13 and 26 24 16 come back Revise and resubmit because the package missed the short circuit and coordination study, the nameplate data or the seismic certification that Part 1 asked for
- Lighting fixtures under 26 51 00 go out without the control compatibility sheets and the reviewer holds the whole fixture schedule
- The grounding and bonding section (26 05 26) asks for test procedures and the testing agency's qualifications before the work, and nobody put them on the log
- Fire alarm under 28 31 00 needs battery calculations, voltage drop calculations and a NICET certificate that sit in different paragraphs than the product data
- Closeout items such as O&M manuals, startup and testing reports, training records and warranties pile up at substantial completion and hold the final payment
A register built from the spec makes these visible on day one. Each of those items already has a row, a due date and an owner. Our page on shop drawings in construction covers what reviewers look for, and the revise and resubmit article lists the checks that cut second rounds.
From the electrical sections to stamped packages
- 1Upload the project manual. Submittal finds the MasterFormat sections, scanned PDFs included, and you pick the ones you hold, for example 26 05 19, 26 05 26, 26 24 16, 26 27 26, 26 51 00, 27 10 00 and 28 31 00.
- 2Review the register. Each required item is one row with its paragraph. Action, informational and closeout items are separated, so the O&M and warranty list exists before the first submission.
- 3Build packages. Group rows into packages numbered the way the GC wants, attach manufacturer data, your shop drawings and the cover sheet.
- 4Send for review. The package goes to the GC, the electrical engineer and the architect in order, each with a stamp. You see whose turn it is and when it is overdue.
- 5Close out. Approved items stay linked to their rows, and the closeout list is ready when the job is.
The longer walkthrough is on the construction specification software page.
Electrical contractors and their project teams
- Project managers at electrical and low voltage subs who run several jobs for different GCs at the same time
- Project engineers and coordinators who build packages and chase stamps, and who currently keep the register in Excel
- Estimators and detailers who contribute product data and need to see which sections still lack items
- Design-build electrical firms that carry both the engineering and the submittal burden
- Fire alarm, security and data contractors who work from Divisions 27 and 28 on the same job
Subs who join a GC's project that already runs in Submittal join at no cost. Your own projects are billed per project. See the wider sub view on the subcontractor software page, and the sister page for mechanical contractors.
What electrical submittal software costs per project
Per user tools charge for every PM, coordinator and estimator who touches a package. Submittal charges for active projects, and subcontractors and reviewers you invite are unlimited.
| Your workload | Submittal plan | Yearly cost billed yearly |
|---|---|---|
| 1 active project | Starter | 288 USD |
| Up to 5 active projects | Team | 888 USD |
| Up to 25 active projects | Business | 2,988 USD |
Monthly billing is 49, 149 and 499 USD. For vendor by vendor numbers see the submittal software pricing comparison, and for our own limits see the submittal management software page.
Keep the GC's system and run your own register
Most electrical subs do not choose the platform. The GC does. You upload packages into Procore on one job, send a PDF transmittal on the next and email an Excel log every Friday on the third. A register of your own reads your sections, keeps the revision history in one place across GCs, and exports in whatever form the GC asks for. When the job ends, your record does not disappear with the GC's account. To see how the GC side compares, read the Procore submittals alternative page, and for overdue and reminder views see submittal tracking software.
Frequently asked questions
What is the best submittal software for electrical contractors?
The best fit is software that reads your Division 26, 27 and 28 sections, lists every required item with its paragraph, tracks stamps and lead times, and exports to any GC's format. Submittal does this and is priced per project, from 24 USD a month billed yearly for one active project.
What submittals does an electrical contractor have to provide?
It depends on the spec, but a typical electrical set includes product data for gear, panelboards and fixtures, shop drawings for switchgear and raceway, short circuit and coordination studies, fire alarm calculations, test reports, startup reports and closeout items such as O&M manuals and warranties. Each is listed in Part 1 article 1.4 of its section.
Can I build an electrical submittal log from the spec automatically?
Yes. Upload the project manual and Submittal creates one register row for each item the electrical sections require, linked to its paragraph. You review and edit the rows, then group them into packages numbered in your format.
Do I need to pay if the GC already uses Procore?
Not to respond on the GC's project, since subs are normally invited as collaborators. You pay only if you want your own register across jobs. Joining a GC's project in Submittal is free on every plan.
Can low voltage and fire alarm use the same setup?
Yes. Division 27 communications and Division 28 electronic safety sections are read the same way. Each item gets a row, a paragraph reference and a review route, so one register can cover power, low voltage and fire alarm on a job.