Submittal software for concrete and rebar contractors, built from your Division 03 spec
Submittal software for concrete and rebar contractors should read Division 03, list every submittal each section demands with its paragraph reference, and track each package through the GC and engineer until the stamp comes back. Submittal does that. Upload the project manual, get one register row per required item (mix designs, rebar shop drawings, placing drawings, formwork and shoring designs, embed and anchor data, test reports, warranties), and keep pours from waiting on an approval nobody sent. Plans start at 24 USD a month per active project billed yearly, and the GC and design team you invite are unlimited.

What a concrete submittal register has to cover
Concrete is a trade where the submittal gates the pour. Rebar is detailed and fabricated from approved placing drawings, mix designs have to be approved before the plant batches anything, and a late shoring or formwork design can push the whole deck sequence. A generic log tells you a package exists. A spec built register tells you which items in each section you have not yet sent.
| Division 03 section | Typical submittals the spec asks for | Why they hold up the job |
|---|---|---|
| 03 30 00 cast in place concrete | Mix designs for each strength and exposure class, admixture data, batch plant certifications, hot and cold weather plans, placement and curing plans | The plant cannot batch until the mix is approved, and the structural engineer usually reviews every mix |
| 03 20 00 concrete reinforcing | Rebar shop drawings and placing drawings, bar lists, mill certificates, splice and coupler data | Fabrication starts from approved drawings, and a returned sheet restarts detailing |
| 03 11 00 concrete forming | Formwork and shoring design, form tie and accessory data, reshoring plan, stripping schedule | Engineered shoring often needs a stamped design before the first deck is formed |
| 03 15 00 concrete accessories | Embed plates, anchor bolts, dowels, inserts, waterstops and expansion joints | Embeds are set before the pour and coordinated with steel, curtain wall and MEP |
| 03 35 00 concrete finishing | Finishing and floor flatness plans, sealer and hardener data, mockup panels | Flatness tolerances and finish mockups are checked against the spec |
| 03 38 00 post tensioning | Tendon layout, stressing sequence, engineer calculations, installer qualifications | Layout drawings are approved before tendons are fabricated |
| Section 01 33 00 and 01 45 00 | Testing agency reports, certifications and closeout items | Cylinder breaks, inspector reports and warranties gate acceptance and final payment |
Try it on your own Division 03 sections before you buy. The homepage tool builds the rows for a spec section you upload, so you can see whether it finds the items your project manager would find.
The submittal problems that delay a pour
Most pour delays show up in the submittal log weeks before the trucks are booked.
- Mix designs that go to the engineer one at a time, when the spec wants every strength class and exposure condition covered in one package
- Rebar shop drawings returned with comments on a few sheets, then held as a complete set while fabrication waits
- Shoring and formwork designs that need a stamp from a licensed engineer and are submitted the week before the first deck
- Embeds and anchor bolts that belong to the steel, curtain wall or MEP trades, and are submitted in a different package by someone else
- Testing and inspection reports that the spec wants on file before acceptance, and that pile up unfiled
- Closeout items such as curing records, sealer warranties and test summaries, left for the last week
A register built from the spec makes each of these a row with a due date and an owner on day one. Our guide to construction submittal examples shows how a package is numbered and what comes back with it. When a rebar package returns marked up, what revise and resubmit means explains how to turn comments into a clean second round, and shop drawings versus product data shows which type each Division 03 item is.
From the Division 03 spec to a tracked register
- 1Upload the project manual. Submittal finds the MasterFormat sections, scanned PDFs included, and you select Division 03 plus the administrative and testing sections that touch concrete.
- 2Review the register. Each required item is one row with its paragraph. Action, informational and closeout items are separated, so you see test reports and certifications next to the shop drawings.
- 3Set dates from the schedule. Give each row a due date calculated back from the pour date, the rebar lead time and the shoring install window.
- 4Send and track packages. Each package goes to the GC and the engineer in order, with one of five standard stamps. You see whose turn it is and when it is overdue.
- 5Close out. Test reports, curing records and warranties stay on the list from day one, so nothing is left for the last week.
The longer walkthrough is on the construction specification software page.
Concrete, rebar and formwork teams
- Project managers and estimators at concrete subcontractors who run several jobs for different GCs
- Rebar fabricators and placers who keep shop drawing and placing drawing packages across projects
- Formwork and shoring contractors who need engineered designs approved before the first deck
- Project engineers who keep the submittal log and chase stamps, usually in Excel today
- Owners of small and mid size concrete firms who want one register per job without paying a seat for every office user
Concrete is a subcontract trade on most commercial jobs, so you usually submit into the GC's system and also need your own list. Submittal gives you that list per project, and the GC you invite joins at no cost. Concrete works next to other structural and site trades, so for the sub view across trades see the submittal software for subcontractors page, and for the mechanical and electrical side the mechanical contractors page shows the same approach in Divisions 21 to 23. If you are weighing platforms, the best submittal software for subcontractors comparison shows what each costs.
What concrete submittal software costs per project
Per user tools charge for every estimator, PM and coordinator who opens a package. Submittal charges for active projects, and the GC, architect and engineers you invite are unlimited.
| Your workload | Submittal plan | Yearly cost billed yearly |
|---|---|---|
| 1 active project | Starter | 288 USD |
| Up to 5 active projects | Team | 888 USD |
| Up to 25 active projects | Business | 2,988 USD |
Monthly billing is 49, 149 and 499 USD. Compare that with the hours spent building a Division 03 register by hand for each award, then with one rebar package that sits in review for two weeks because a bar list was missing. For vendor by vendor numbers see the submittal software pricing comparison, and for our own limits see the submittal management software page.
Check the submittal against the right reference
Concrete specs cite outside standards, and the submittal has to show the work meets them. Concrete mix and placement requirements are commonly tied to the American Concrete Institute codes and specifications published at concrete.org, and rebar detailing and placing practice is covered by the Concrete Reinforcing Steel Institute at crsi.org. Submittal does not replace engineering review. It makes sure each item is on the list, has an owner and a date, and is not forgotten until the batch plant or the fabricator asks for it.
What to look for in submittal software for concrete work
Ask five things before you buy. Does it read the specification itself, or do you type every row? Does each row keep its paragraph reference, so a reviewer can see why it exists? Can you group items into numbered packages, such as one mix design package and one rebar package per level? Does it handle resubmittals as new revisions without losing the history? And does the price follow the number of jobs, or the number of people in your office? Those answers decide whether the tool saves time on the third job or only on the first.
Frequently asked questions
What is the best submittal software for concrete contractors?
The best fit reads the Division 03 sections, lists every required submittal with its paragraph, and tracks each package through the GC and engineer. Submittal does this and is priced per active project, from 24 USD a month billed yearly for one project, with the GC and reviewers free.
What submittals does a concrete contractor usually have to provide?
Typically mix designs, rebar shop drawings and placing drawings, formwork and shoring designs, embed and anchor data, testing agency reports, finishing plans and warranties. Your spec lists them paragraph by paragraph, and the register keeps them together.
Can I build a rebar and mix design submittal log from the specifications?
Yes. Upload the project manual and Submittal creates one register row per item each section requires, linked to its paragraph, including mix designs and rebar shop drawings. You review the rows, set due dates and group them into numbered packages.
Do concrete subcontractors pay for the GC's submittal software?
It depends on the GC's platform. Many charge nothing to submit into it, but you still need your own list across jobs and GCs. A per project tool keeps that register in one place without paying a seat for every office user.
How much does submittal software cost for a concrete company?
Submittal charges per active project, not per user. One project is 288 USD a year billed yearly, five projects 888 USD, and 25 projects 2,988 USD. The GC and reviewers you invite are unlimited.