Submittal software for mechanical contractors, with HVAC and plumbing submittals built from your spec
Submittal software for mechanical contractors should read your Division 21, 22 and 23 sections, list every item they require with its paragraph reference, and track each package through the GC and engineer until the stamp comes back. Submittal does that. Upload the project manual, get one register row per required item (product data, shop drawings, coordination drawings, test and balance reports, O&M manuals), and run packages through review on a plan that costs 24 USD a month per active project billed yearly. The GC's own platform does not have to change.

What submittal software fits a mechanical, HVAC or plumbing contractor
A mechanical sub needs three things from a submittal tool. It has to find everything the mechanical sections ask for, including the closeout items nobody reads until the last month. It has to work across GCs who run different systems. And it has to be priced so that a PM who runs six jobs a year does not pay for six seats times four people.
| What a mechanical sub needs | How Submittal handles it |
|---|---|
| Every item from Division 21, 22 and 23 listed from Part 1 | One register row per item, each linked to its section and paragraph, for example 23 31 13, 1.4.A |
| Long lead equipment tracked by date | Lead-time tracking back-calculates the submit date from the required on site date, on Team and higher |
| Packages that match the GC's numbering | Numbering such as 233113-002-R1, custom formats on Team and higher |
| Review through GC, mechanical engineer and architect | Review route in order with five standard stamps and ball in court |
| Working for GCs on Procore, Autodesk Build or Fieldwire | Run your own register, export Excel, CSV or PDF in the format each GC wants |
| Closeout and retainage | Closeout items split out of Part 1 from day one, one closeout binder PDF on Business and Enterprise |
| Cost | Per active project, not per user. Starter 24 USD a month yearly, Team 74 for five projects |
Try it on one section before you buy. The homepage tool builds the rows for a spec section you upload, so you can see whether it catches what your PM would catch.
Where mechanical packages go wrong
Mechanical submittals are heavy on equipment and coordination, and the same few problems cause most resubmittals.
- An air handling unit under 23 73 00 comes back Revise and resubmit because the package missed the coil schedule, the controls interface or the seismic anchorage calculation that Part 1 asked for
- Ductwork shop drawings under 23 31 13 go out before the ceiling coordination is done, and the next revision starts after the fabricator has already cut sheet metal
- The testing, adjusting and balancing section (23 05 93) asks for the agency's qualifications and a preliminary procedure before the work, and nobody put them on the log
- Hydronic piping under 23 21 13 needs welder certificates and pipe support data that sit in a different paragraph than the product data
- Closeout items such as O&M manuals, startup reports, training records and warranties pile up at substantial completion and hold the final payment
A register built from the spec makes these visible on day one. Each of those items already has a row, a due date and an owner. Our page on shop drawings in construction covers what reviewers look for in mechanical shop drawings, and the revise and resubmit article lists the checks that cut second rounds.
From the mechanical sections to stamped packages
- 1Upload the project manual. Submittal finds the MasterFormat sections, scanned PDFs included, and you pick the ones you hold, for example 21 13 13, 22 11 16, 23 05 93, 23 21 13, 23 31 13, 23 73 00 and 23 09 00.
- 2Review the register. Each required item is one row with its paragraph. Action, informational and closeout items are separated, so the O&M and warranty list exists before the first submission.
- 3Build packages. Group rows into packages numbered the way the GC wants, attach manufacturer data, your shop drawings and the cover sheet.
- 4Send for review. The package goes to the GC, the mechanical engineer and the architect in order, each with a stamp. You see whose turn it is and when it is overdue.
- 5Close out. Approved items stay linked to their rows, and the closeout list is ready when the job is.
The longer walkthrough is on the construction specification software page.
Mechanical contractors and their project teams
- Project managers at HVAC, plumbing and fire protection subs who run several jobs for different GCs at the same time
- Project engineers and coordinators who build packages and chase stamps, and who currently keep the register in Excel
- Estimators and detailers who contribute product data and need to see which sections still lack items
- Design-build mechanical firms that carry both the engineering and the submittal burden
- Service and retrofit contractors who take on tenant improvement jobs with a full spec and a short schedule
Sprinkler work has its own approvals, so see submittal software for fire protection contractors. Subs who join a GC's project that already runs in Submittal join at no cost. Your own projects are billed per project. See the wider sub view on the subcontractor software page, and the sister page for electrical contractors. If your firm also does roof curbs and flashing, read the page on submittal software for roofing contractors.
What mechanical submittal software costs per project
Per user tools charge for every PM, coordinator and estimator who touches a package. Submittal charges for active projects, and subcontractors and reviewers you invite are unlimited.
| Your workload | Submittal plan | Yearly cost billed yearly |
|---|---|---|
| 1 active project | Starter | 288 USD |
| Up to 5 active projects | Team | 888 USD |
| Up to 25 active projects | Business | 2,988 USD |
Monthly billing is 49, 149 and 499 USD. For vendor by vendor numbers see the submittal software pricing comparison, and for our own limits see the submittal management software page.
Keep the GC's system and run your own register
Most mechanical subs do not choose the platform. The GC does. You upload packages into Procore on one job, send a PDF transmittal on the next and email an Excel log every Friday on the third. A register of your own reads your sections, keeps the revision history in one place across GCs, and exports in whatever form the GC asks for. When the job ends, your record does not disappear with the GC's account. To see how the GC side compares, read the Procore submittals alternative page, and for overdue and reminder views see submittal tracking software.
Frequently asked questions
What is the best submittal software for mechanical contractors?
The best fit is software that reads your Division 21, 22 and 23 sections, lists every required item with its paragraph, tracks stamps and lead times, and exports to any GC's format. Submittal does this and is priced per project, from 24 USD a month billed yearly for one active project.
What submittals does an HVAC contractor have to provide?
It depends on the spec, but a typical HVAC set includes product data for equipment, shop and coordination drawings for ductwork and piping, controls submittals, test and balance qualifications and reports, startup reports and closeout items such as O&M manuals and warranties. Each is listed in Part 1 article 1.4 of its section.
Can I build an HVAC submittal log from the spec automatically?
Yes. Upload the project manual and Submittal creates one register row for each item the mechanical sections require, linked to its paragraph. You review and edit the rows, then group them into packages numbered in your format.
Do I need to pay if the GC already uses Procore?
Not to respond on the GC's project, since subs are normally invited as collaborators. You pay only if you want your own register across jobs. Joining a GC's project in Submittal is free on every plan.
Can plumbing and fire protection use the same setup?
Yes. Division 22 plumbing and Division 21 fire suppression sections are read the same way. Each item gets a row, a paragraph reference and a review route, so one register can cover all three scopes on a job.