Submittal software for construction managers, with the register built from the spec and every review tracked
Submittal software for construction managers should read the project manual, list every submittal the specs require with its paragraph reference, and show which trade or reviewer holds each package right now. Submittal does that. Upload the specs, get one register row per required item, assign each to its responsible trade contractor, and track every package through the architect and engineers until the stamp comes back. Plans start at 24 USD a month per active project billed yearly, and trade contractors and reviewers you invite are unlimited.

What submittal software fits a construction manager
A construction manager does not produce most of the packages, but is accountable for the schedule they drive. On CM at risk, CM agency and multiple prime jobs, that means one list across many trades and several design reviewers. Per user tools make that expensive and trade logs make it unreadable.
| What a construction manager needs | How Submittal handles it |
|---|---|
| A complete register before the first trade is buying out | One row per required item from the specs, each linked to its section and paragraph |
| One view across trade contractors | Every row has a responsible party, a due date and a status, filtered by trade or division |
| Who is holding the package | Review route in order with five standard stamps and ball in court |
| Early warning on late items | Overdue and reminder views, with lead-time tracking on Team and higher |
| Numbering that matches the project | Numbering such as 092900-004-R1, custom formats on Team and higher |
| Reporting to the owner and the design team | Export Excel, CSV or PDF of the register at any point |
| Cost that does not grow with headcount | Per active project, not per user. Starter 24 USD a month yearly, Team 74 for five projects |
Try it on one spec section before you buy. The homepage tool builds the rows for a section you upload, so you can see whether it catches what your project engineer would catch.
The problems a CM register has to expose
Most schedule damage from submittals is visible weeks before it hits the field, if someone has the whole list.
- Items that no trade picked up because they sit in Part 1 of a section nobody read closely, such as mockups, qualification statements and test reports
- Long lead gear and finishes whose approval date was never back-calculated from the required on site date
- Packages that sit with the architect or an engineer for two review cycles while the trade assumes they are approved
- Resubmittals that come back Revise and resubmit for the same missing item twice
- Closeout items such as O&M manuals, warranties and attic stock that pile up at substantial completion and hold final payment
A register built from the spec makes each of these a row with a due date and an owner on day one. Our page on construction submittals explains the types, and the revise and resubmit article lists the checks that cut second rounds.
From the project manual to a tracked register
- 1Upload the project manual. Submittal finds the MasterFormat sections, scanned PDFs included, and you select the divisions that apply.
- 2Review the register. Each required item is one row with its paragraph. Action, informational and closeout items are separated.
- 3Assign trades. Give each row a responsible party and a due date tied to your schedule.
- 4Route packages. Each package goes to the architect and engineers in order, each with a stamp. You see whose turn it is and when it is overdue.
- 5Report and close out. Export the register for the owner meeting and keep the closeout list ready from the start.
The longer walkthrough is on the construction specification software page.
Construction managers and their project teams
- Project managers and senior PMs at CM at risk and CM agency firms
- Project engineers who run the submittal log and chase stamps, currently in Excel
- Superintendents and schedulers who need to know which approvals gate the next buyout
- Owner representatives and program managers who want one list across several projects
- Design-build teams that carry both coordination and submittal burden
Trade contractors who join a project already running in Submittal join at no cost. If you run packages for the general side, see submittal software for general contractors, and if you are comparing platforms read the Procore submittals alternative page.
What submittal software costs per project
Per user tools charge for every PM, engineer and superintendent who opens a package. Submittal charges for active projects, and trades and reviewers you invite are unlimited.
| Your workload | Submittal plan | Yearly cost billed yearly |
|---|---|---|
| 1 active project | Starter | 288 USD |
| Up to 5 active projects | Team | 888 USD |
| Up to 25 active projects | Business | 2,988 USD |
Monthly billing is 49, 149 and 499 USD. For vendor by vendor numbers see the submittal software pricing comparison, and for our own limits see the submittal management software page.
One list for the weekly coordination meeting
Most CM teams run a weekly submittal review. The useful version of that meeting starts from one filtered list: overdue by trade, held by reviewer, due in the next two weeks. That is what the overdue and reminder views produce, and it is covered in detail on the submittal tracking software page.
Frequently asked questions
What is the best submittal software for construction managers?
The best fit reads the project manual, lists every required submittal with its paragraph, routes packages to the architect and engineers, and shows who holds each one. Submittal does this and is priced per active project, from 24 USD a month billed yearly for one project.
Does a construction manager need submittal software if the GC runs submittals?
On a CM at risk or multiple prime job, the CM is accountable for schedule across trades, so a register of your own shows which packages are late and who holds them. You can keep the GC or trade contractor systems and export their logs into one view.
Can I build the submittal register from the specifications?
Yes. Upload the project manual and Submittal creates one register row per item each section requires, linked to its paragraph. You review the rows, assign responsible trades and group them into numbered packages.
How does a construction manager track submittals across trade contractors?
Each package has a responsible party, a due date and a review route. The overdue and ball in court views show which trade or reviewer is holding a package, so the weekly meeting works from one list instead of several trade logs.
How much does submittal software cost for a construction management firm?
Submittal charges per active project, not per user. One project is 288 USD a year billed yearly, five projects 888 USD, and 25 projects 2,988 USD. Trade contractors and reviewers you invite are unlimited.